Saturday, May 15, 2010

Wood Floors









Our cabinet painting project was highly motivated by our desire to get rid of our 1980's linoleum and stained carpet. So as soon as we had that project completed, we called our floor guy up to schedule the installation! In the first picture it gives a close-up of the old linoleum and the second picture is what the house looked like once the carpet had been ripped up and it was officially "under construction". Armando, our flooring guy, told us that he could have the project done in one day...well, little did he know that underneath our linoleum, there was plywood that had been stapled on top of our sub floor that had to be removed before the wood floor could be installed. That removal took almost an entire day! For four full days our house was literally a construction zone with dust coating EVERYTHING! We had sheets up to prevent dust from going into the family room, but we spent hours cleaning up once they were finally done with the installation. Our whole main level looks entirely different now and, although it took longer than we expected, we are definitely happy with the results! All of our main living areas are now officially livable to my standards (of course the linoleum was livable, but the 20 year old stained carpet in our formal living room was a little difficult to deal with, so we avoided the room altogether until now). Hopefully Paul and I can do something with our Master Bedroom come summertime!

1 comment:

  1. Wow that floor is beautiful. Your kitchen looks like a completely different room than it did at first. It has been quite the transformation.

    ReplyDelete